Public deliverables

Public deliverables from the Photo2Fuel project


On specific dates, periodic assessment reports called "deliverables" have to be submitted to the European Commission in order to evaluate the progress of the project. On this page, you can find the public documents from the Photo2Fuel project.

Deliverable Number: D5.1

Report containing the process models for the hybrid systems

This deliverable will contain the process models for the basic modelling of the hybrid systems. This process models will serve as basis for the sustainability assessment of the models.

Due date:

ID: ETH

Deliverable Number: D2.1

Experimental design of the hybrid systems

This deliverable contains the experimental design of the hybrid systems: organic photosensitisers and bacterias. It will contain the amount of experiments to be conducted and parameters to be analysed in them.

Due date:

ID: UU

Deliverable Number: D3.2

Selection of the final device

This deliverable will contain the results of the MDO problem and according to it, the hybrid device that will be upscaled.

Due date:

ID: IDE

Deliverable Number: D2.2

Final report of the hybrid devices: testing, characterisation, and efficiency

This deliverable will contain the final report of the hybrid devices. It will include the testing, characterisation, and efficiency results of the experiments.

Due date:

ID: ICCAS

Deliverable Number: D4.4

Assembly of the selected device

This deliverable will contain information regarding the assembly of the selected hybrid system for upscaling at photo-micro reactor level.

Due date:

ID: UvA

Deliverable Number: D5.4

Optimisation of Photo2Fuel technology: next steps

This deliverable will include the next steps to be followed for the optimisation of Photo2Fuel technology based on the results of the sustainability assessments.

Due date:

ID: ETH

Deliverable Number: D4.6

Results of the auto sufficient mini-solar plant for fuels/chemicals production

This deliverable will include the results of the auto sufficient mini-solar plant for fuels/chemicals production.

Due date:

ID: UvA

Deliverable Number: D3.5

Results of a final complete simulation

This deliverable will include the results of a final complete simulation of the Photo2Fuel technology at lab scale.

Due date:

ID: IDE